Walter F. George Lock, Powerhouse, and Spillway

This challenging design-build project, the first repair method of its kind, entailed installation of a concrete secant pile cut-off wall immediately upstream of the existing dam and spillway structure, to prevent the flow of water under the dam, eliminating the potential for structural failure.