Project Description

Pillar Point Dredging

On this San Mateo Harbor job, Vortex was responsible for the mechanical dredging of approximately 5,600 cubic yard of sediment at Pillar Point Harbor Boat Launch Ramp. To complete this project we has to construct a 0.79 acre upland dredge material disposal site on Perch Beach, west of the dredge site.

[fusion_images picture_size=”fixed” autoplay=”no” columns=”5″ column_spacing=”13″ scroll_items=”” show_nav=”yes” mouse_scroll=”no” border=”yes” lightbox=”yes” class=”” id=””][fusion_image link=”” linktarget=”_self” image=”http://vortex-sfb.com/wp-content/uploads/2015/06/pillar-point-dredging-san-mateo-1_300.jpg” alt=”pillar-point-dredging-san-mateo-1″/][fusion_image link=”” linktarget=”_self” image=”http://vortex-sfb.com/wp-content/uploads/2015/06/pillar-point-dredging-san-mateo-2_300.jpg” alt=”pillar-point-dredging-san-mateo-2″/][/fusion_images]